In total, each train will now consist of 21 coaches, providing additional capacity and more travel options for passengers.
Trains cancelled, short-terminated, and rescheduled in Rayagada-Vizianagaram section due to works at Komatipalli station.
The semi-high-speed train, which typically departs at 5:40 am, was still at the station by evening, prompting irate ...
Bhopal: High drama was witnessed at Rani Kamalapati railway station in Bhopal after the Vande Bharat Express for Hazrat ...
Rani Kamalapati (Habibganj)–Hazrat Nizamuddin Vande Bharat Express was to leave Rani Kamalapati railway station (RKP) at ...
The Vande Bharat service between Bhopal and Delhi faced an unprecedented eight-hour delay due to a technical snag, stranding passengers and resulting in multiple cancellations. Protests erupted as ...
As a result of the delay, the Vande Bharat Express (20172) from Hazrat Nizamuddin to Rani Kamalapati station was cancelled on ...
Several trains have already been upgraded with LHB coaches and are now standardized with four General Second Class coaches.
Residents of Delhi faced heavy smog and poor visibility on Saturday morning as air quality plummeted back to the “severe” ...